Aerial view of a large red crane on a hillside, working on the construction of a bridge spanning a forested ravine.
Project

US Route 219 Bridge Replacement

  • Location: Springville, NY
  • Owner: New York State Department of Transportation - NYSDOT
  • Project Duration: 2016
  • Size: Approximately $16.9 Million

The project involved Design-Build services for the replacement of the South Cascade Drive/Miller Road bridge over Cattaraugus Creek. The roadway carrying the bridge was formerly NY Route 219. The project was in the Towns of Concord and Ashford, Erie and Cattaraugus Counties, New York. The scope of work included the replacement of the existing three-span, approximately 660’ long bridge. Other responsibilities included the installation of new foundations, removal of existing substructures and superstructure, and approach roadway reconstruction necessary to connect existing roadways to the new bridge.

Project Gallery

Construction site of a bridge pier with cranes operating in a rocky river valley.
Two large cranes lift a long concrete bridge beam into place between concrete piers across a wooded valley.
Wide view of bridge construction over a river in a wooded valley with autumn foliage.
Construction of a bridge pier across a wooded ravine with a river below, featuring scaffolding and a crane.
Aerial view of bridge construction across a river, showing concrete pillars, a temporary bridge, and a crane amidst a heavily wooded area.
A large metal bridge has collapsed into a ravine and a river, with the mangled steel framework lying in the debris below.
Aerial view of a large red crane on a hillside, working on the construction of a bridge spanning a forested ravine.

View More Projects