Project

Skyway Rehabilitation Project

  • Location: Buffalo, NY
  • Owner: New York State Department of Transportation - NYSDOT
  • Project Duration: 2018 - 2020
  • Size: Approximately $32 Million

Cold Spring Construction rehabilitated Buffalo’s iconic Skyway, one of Western New York’s most recognizable transportation structures. The project restored critical structural elements while extending the bridge’s service life and improving safety for thousands of motorists each day.

Project Description

The project scope was the rehabilitation of a four lane one-mile-long bridge on NY Rt. 5 in Buffalo, NY known as The Skyway. The project also included rehabilitation of the Pearl St offramp from NY Rt. 5 eastbound, the ramp eastbound Rt. 5 to I-190 northbound, and the ramp from I-190 southbound to NY Rt. 5 westbound. The project consisted of replacing the upper half of the entire bridge deck utilizing hydro-demolition and replacement with DP concrete including upper rebar mat replacement. The project also included extensive repair to the substructure of the bridge including concrete repairs, steel repairs, and protective coating on the concrete piers. Superstructure repairs other than the upper deck replacement included repairs to the concrete barrier, new street lighting and electrical, new bridge joints, new overhead signage and sign structures, and other various improvements.

The Skyway Rehabilitation Project involved critical structural repairs and improvements to one of Western New York’s most recognizable and heavily traveled bridges. As a vital transportation route connecting downtown Buffalo to surrounding communities, maintaining the integrity and safety of the Skyway was essential.

Cold Spring Construction performed a range of rehabilitation services, including structural concrete repairs, steel work, and roadway surface improvements. The project required precise execution at elevation, often over water, while maintaining strict safety standards and minimizing disruption to daily traffic flow.

 

Challenges & Solutions

Working on an active, elevated structure presented unique logistical and safety challenges. Traffic control and staging were carefully planned to allow continuous use of the Skyway while construction activities were underway.

Environmental exposure, including wind and weather conditions, required adaptable scheduling and specialized equipment. The team leveraged experience in complex bridge work to safely execute repairs in a demanding environment while maintaining productivity and quality.

 

Outcome

The successful rehabilitation of the Skyway extended the service life of this critical infrastructure asset while improving safety and performance for the traveling public. The project reflects Cold Spring Construction’s ability to manage complex, high-visibility infrastructure work with precision, coordination, and a strong commitment to safety.

Project Gallery

A section of an elevated highway under construction, showing a grid of green epoxy-coated rebar laid out over the road surface.
A crane lifts a long metal pole near highway overpasses while workers in high-visibility vests stand on the road and ground below.
Construction workers use a crane and boom lift to repair a concrete pier outdoors.
View from an elevated highway ramp overlooking a city skyline under a clear blue sky, with a prominent tall skyscraper on the right.
View from an elevated highway ramp overlooking a city skyline under a clear blue sky, with a prominent tall skyscraper on the right.
View from an elevated roadway looking toward a city skyline featuring a prominent tall rectangular building on a clear day.
A construction worker in a high-visibility vest stands in a boom lift to repair a damaged concrete highway pillar.

View More Projects